Case Studies

Repair and waterproofing of Army Bunker in Silliguri

Repair and rehabilitation to arrest water leakages and restoration of Army Bunker –Siliguri using KCPL range of construction chemicals ( Sector- Defence)


Repair &Grouting of Railway Tracks(Sector-Railways)

TAs per DMRC specifications and guidelines (Usage and need of proper construction chemicals during supply/installation, testing and commissioning of ballastless track


Repair and waterproofing of Charbagh Railway Station

The CHARBAGH railway station has been constructed in the year 1914 With elegant Elevations (Compression Members),


Road Sector ( Supply of admixtures to Yammuna Expressway

Supply of Concrete admixtures and super plasticizers for Pozzolana Portland Cement (PPC) enabled rigid pavement concrete


Supply of High performance admixtures to Rewa-Siddi 4 laning of National Highway

4 laning of National Highway project from Rewa to Siddi in state of Madhya Pradesh involving 6 .0 lakh cubic concrete of rigid pavement and super structure in flyovers and bridges across water bodies.


330 MW Kishanganga Hydro Electric Power Project Kishanganga HEP (J&K)

on tributary of Jhelum in Gurez (Jammu&Kashmir). One of the most difficult and strategic location for GOI due to proximity to POK.The total project cost is around 1 Bn US$ including 37 m high gravity concrete dam,24KM (15 mi) tunnel and over 1 million cubic meter of concrete and shotcrete


Waterproofing and repair at Bestech Mohali

Integrated development of a 11-tower residential complex, five-star hotel, office and commercial space at Mohali over an area of 50 acres by Bestech India Private Limited and their subsidiary Starwood Contracts Private Limited


Repair of Existing PQC Road-NH 2 6 Lane(sector-road)

Repair of existing cracks in Pavement Quality Concrete (PQC) roads from Etawaha-Chakeri section of National Highway 2


Waterproofing and repair of U/G tunnel ,OT duct and launching shaft

Waterproofing and repair of U/G tunnel ,OT duct and launching shaft using Single component PU grout through injection methodology at DMRC CC -24 Package (HZN- Ashram stretch


Waterproofing of roof slab and walls for U/G Metro Station at CCS Airport.

Waterproofing of roof slab and walls for U/G Metro Station at CCS Airport for Underground stretch of Lucknow Metro Rail Corporation (LMRC) using 2 component highly elastic liquid membrane


Supply of high performance high early strength superplasticizers

Supply of high performance high early strength superplasticizers (concrete admixtures) for extremely challenging Rupnarayan Bridge (Kolaghat bridge) on NH 6 in state of West Bengal.We also did anti carbonation coating of the structure to protect deterioration from highly moist surroundings


Comprehensive repair and rehabilitation work at Adani -Dhamra port

Comprehensive repair and rehabilitation work at Adani -Dhamra port.Conducting testing and subsequent strengthening measures of pile and pile caps at Stacker reclaimer area for various defects at Dhamra Port


Thermal Power project in state of west bengal.4500 sqm job

Roof waterproofing treatment done at Sagardighi Thermal Power project in state of west bengal.4500 sqm job


Subscribe for Newsletter

Stay up to date with the latest news, views and opportunities.