on tributary of Jhelum in Gurez (Jammu&Kashmir). One of the most difficult and strategic location for GOI due to proximity to POK.The total project cost is around 1 Bn US$ including 37 m high gravity concrete dam,24KM (15 mi) tunnel and over 1 million cubic meter of concrete and shotcrete
Supply of high performance high early strength superplasticizers (concrete admixtures) for extremely challenging Rupnarayan Bridge (Kolaghat bridge) on NH 6 in state of West Bengal.We also did anti carbonation coating of the structure to protect deterioration from highly moist surroundings